View Issue Details
| ID | Project | Category | View Status | Date Submitted | Last Update |
|---|---|---|---|---|---|
| 0001840 | T99X171.00 SKB Eagle | General | public | 2023-11-24 11:28 | 2025-04-07 10:10 |
| Reporter | (ALTech) SH Son | Assigned To | (MFG) Rachel Ruan | Due Date | |
| Priority | normal | Severity | s3-moderate | Reproducibility | have not tried |
| Status | closed | Resolution | fixed | ||
| Summary | 0001840: [EAGLE] 2023.11 Mass production inspection Report | ||||
| Description | [EAGLE] 2023.11 Mass production inspection Report | ||||
| Tags | No tags attached. | ||||
| Attach Tags | |||||
| related to | 0001662 | new | [Eagle] Mass production inspection Report |
| User List |
(ALTech) BY Lee , (ALTech) Hyunsik Kim , (ALTech) JW Kim , (ALTech) Lonnie Kim , (ALTech) SH Son , (ALTech) Sophie Lee , |
|---|
|
|
HI An and Rachel Here is inspection report of this month. • Major Stain of Top housing rear side * 25% • Minor HDMI cable cosmetic issue * 1pcs Please find the attachment file, and Please let me know if you need a defect sample for analysis Thanks |
|
|
HI An and Rachel Please upload FA report about last month. Thanks SON |
|
|
Dear SH Son Pls help review FA report: 1. Stain of Top housing rear side * 25% => Fii Action: We re-definite SOP at visual inspection station, use water ( not use alcohol ) for clean dust. Done 04-Dec-2023. 2. HDMI cable cosmetic issue * 1pcs => Fii skip monitor this issue online production. Many thanks PQE: Rachel |
| Date Modified | Username | Field | Change |
|---|---|---|---|
| 2023-11-24 11:28 | (ALTech) SH Son | New Issue | |
| 2023-11-24 11:28 | (ALTech) SH Son | Relationship added | related to 0001662 |
| 2023-11-27 10:51 | (SW) Jacky Chiang | Severity | s2-severe => s3-moderate |
| 2023-12-05 14:06 | (ALTech) SH Son | Issue Monitored: (ALTech) BY Lee | |
| 2023-12-05 14:06 | (ALTech) SH Son | Issue Monitored: (ALTech) Hyunsik Kim | |
| 2023-12-05 14:06 | (ALTech) SH Son | Issue Monitored: (ALTech) JW Kim | |
| 2023-12-05 14:06 | (ALTech) SH Son | Issue Monitored: (ALTech) Lonnie Kim | |
| 2023-12-05 14:06 | (ALTech) SH Son | Issue Monitored: (ALTech) SH Son | |
| 2023-12-05 14:06 | (ALTech) SH Son | Issue Monitored: (ALTech) Sophie Lee | |
| 2023-12-05 14:06 | (ALTech) SH Son | Issue Monitored: (ALTech) Sun Choul Joung | |
| 2023-12-05 14:06 | (ALTech) SH Son | Issue Monitored: (ALTech) SY Yoon | |
| 2023-12-05 14:06 | (ALTech) SH Son | Issue Monitored: (MFG) An Tran | |
| 2023-12-05 14:06 | (ALTech) SH Son | Issue Monitored: (MFG) Ben Trinh | |
| 2023-12-05 14:06 | (ALTech) SH Son | Issue Monitored: (MFG) Rachel Ruan | |
| 2023-12-05 14:06 | (ALTech) SH Son | Issue Monitored: (MFG) Toney Tu | |
| 2023-12-05 14:06 | (ALTech) SH Son | Issue Monitored: (PM) Dennis Lu | |
| 2023-12-05 14:06 | (ALTech) SH Son | Issue Monitored: (PM) Sheila Tu | |
| 2023-12-05 14:06 | (ALTech) SH Son | Issue Monitored: (PM) Tiffanie Lai | |
| 2023-12-05 14:06 | (ALTech) SH Son | Issue Monitored: (Sales) Miya Wang | |
| 2023-12-05 14:07 | (ALTech) SH Son | Note Added: 0014670 | |
| 2023-12-05 14:07 | (ALTech) SH Son | File Added: [EAGLE] 2023.11_Mass production inspection_rev01.pdf | |
| 2023-12-05 14:07 | (ALTech) SH Son | Assigned To | => (MFG) Rachel Ruan |
| 2023-12-05 14:07 | (ALTech) SH Son | Status | new => assigned |
| 2023-12-18 09:15 | (ALTech) SH Son | Note Added: 0014749 | |
| 2023-12-19 11:17 | (MFG) Rachel Ruan | Note Added: 0014769 | |
| 2023-12-19 11:17 | (MFG) Rachel Ruan | File Added: BFX-AT100 Nov-2023 Production Inspection Fail ver 01.pptx | |
| 2025-04-07 10:10 | (PM) Sheila Tu | Status | assigned => closed |
| 2025-04-07 10:10 | (PM) Sheila Tu | Resolution | open => fixed |