View Issue Details

IDProjectCategoryView StatusLast Update
0001840T99X171.00 SKB EagleGeneralpublic2025-04-07 10:10
Reporter(ALTech) SH Son Assigned To(MFG) Rachel Ruan Due Date
PrioritynormalSeveritys3-moderateReproducibilityhave not tried
Status closedResolutionfixed 
Summary0001840: [EAGLE] 2023.11 Mass production inspection Report
Description[EAGLE] 2023.11 Mass production inspection Report
TagsNo tags attached.
Attach Tags

Relationships

related to 0001662 new [Eagle] Mass production inspection Report 

Users monitoring this issue

User List (ALTech) BY Lee , (ALTech) Hyunsik Kim , (ALTech) JW Kim , (ALTech) Lonnie Kim , (ALTech) SH Son , (ALTech) Sophie Lee , (ALTech) Sun Choul Joung , (ALTech) SY Yoon , (MFG) An Tran , (MFG) Ben Trinh , (MFG) Rachel Ruan , (MFG) Toney Tu , (PM) Dennis Lu , (PM) Sheila Tu , (PM) Tiffanie Lai , (Sales) Miya Wang

Activities

(ALTech) SH Son

2023-12-05 14:07

developer   ~0014670

HI An and Rachel

Here is inspection report of this month.
• Major
 Stain of Top housing rear side * 25%
• Minor
 HDMI cable cosmetic issue * 1pcs

Please find the attachment file, and Please let me know if you need a defect sample for analysis


Thanks

(ALTech) SH Son

2023-12-18 09:15

developer   ~0014749

HI An and Rachel

Please upload FA report about last month.


Thanks
SON

(MFG) Rachel Ruan

2023-12-19 11:17

developer   ~0014769

Dear SH Son

Pls help review FA report:

 1. Stain of Top housing rear side * 25% => Fii Action: We re-definite SOP at visual inspection station, use water ( not use alcohol ) for clean dust. Done 04-Dec-2023.

 2. HDMI cable cosmetic issue * 1pcs => Fii skip monitor this issue online production.

Many thanks
PQE: Rachel

Issue History

Date Modified Username Field Change
2023-11-24 11:28 (ALTech) SH Son New Issue
2023-11-24 11:28 (ALTech) SH Son Relationship added related to 0001662
2023-11-27 10:51 (SW) Jacky Chiang Severity s2-severe => s3-moderate
2023-12-05 14:06 (ALTech) SH Son Issue Monitored: (ALTech) BY Lee
2023-12-05 14:06 (ALTech) SH Son Issue Monitored: (ALTech) Hyunsik Kim
2023-12-05 14:06 (ALTech) SH Son Issue Monitored: (ALTech) JW Kim
2023-12-05 14:06 (ALTech) SH Son Issue Monitored: (ALTech) Lonnie Kim
2023-12-05 14:06 (ALTech) SH Son Issue Monitored: (ALTech) SH Son
2023-12-05 14:06 (ALTech) SH Son Issue Monitored: (ALTech) Sophie Lee
2023-12-05 14:06 (ALTech) SH Son Issue Monitored: (ALTech) Sun Choul Joung
2023-12-05 14:06 (ALTech) SH Son Issue Monitored: (ALTech) SY Yoon
2023-12-05 14:06 (ALTech) SH Son Issue Monitored: (MFG) An Tran
2023-12-05 14:06 (ALTech) SH Son Issue Monitored: (MFG) Ben Trinh
2023-12-05 14:06 (ALTech) SH Son Issue Monitored: (MFG) Rachel Ruan
2023-12-05 14:06 (ALTech) SH Son Issue Monitored: (MFG) Toney Tu
2023-12-05 14:06 (ALTech) SH Son Issue Monitored: (PM) Dennis Lu
2023-12-05 14:06 (ALTech) SH Son Issue Monitored: (PM) Sheila Tu
2023-12-05 14:06 (ALTech) SH Son Issue Monitored: (PM) Tiffanie Lai
2023-12-05 14:06 (ALTech) SH Son Issue Monitored: (Sales) Miya Wang
2023-12-05 14:07 (ALTech) SH Son Note Added: 0014670
2023-12-05 14:07 (ALTech) SH Son File Added: [EAGLE] 2023.11_Mass production inspection_rev01.pdf
2023-12-05 14:07 (ALTech) SH Son Assigned To => (MFG) Rachel Ruan
2023-12-05 14:07 (ALTech) SH Son Status new => assigned
2023-12-18 09:15 (ALTech) SH Son Note Added: 0014749
2023-12-19 11:17 (MFG) Rachel Ruan Note Added: 0014769
2023-12-19 11:17 (MFG) Rachel Ruan File Added: BFX-AT100 Nov-2023 Production Inspection Fail ver 01.pptx
2025-04-07 10:10 (PM) Sheila Tu Status assigned => closed
2025-04-07 10:10 (PM) Sheila Tu Resolution open => fixed